Jahanzaib

SaaS MVP development · 30 day sprint

Your SaaS idea, live with real signups and billing in 30 days.

I build it myself. One core feature, signup, Stripe billing and the AI piece your users came for, shipped to production in a 30 day sprint. The code sits in your GitHub from the first commit, and every line the AI drafts gets reviewed by me before it merges.

  • 30 day sprint
  • Code in your GitHub
  • One engineer, no handoffs

Day

30 / 30

Live with real users
Design doc
Database
Signup and login
Core feature
AI feature
Stripe billing
Analytics
Alerts
Security report

The problem

Most MVPs fail by building the wrong thing slowly.

The expensive mistake is not a bug. It is six months of features nobody asked for, paid for before a single user logged in. By the time real feedback arrives, the runway is gone.

A 30 day sprint forces the only question that matters early: will someone sign up, use the core feature, and pay? Everything that does not help answer it waits until after launch.

43%

of venture backed startups that shut down since 2023 named poor product market fit as a root cause.

CB Insights, 2026

~13 months

is the usual timeline of a software project reviewed on Clutch, at an average cost of $132,480.

Clutch pricing guide, 2026

45%

of AI generated code samples introduced a security flaw in Veracode’s tests. AI speed without review is a liability.

Veracode, 2025

Scope check

Does your idea fit 30 days?

Pick the core feature and what version one needs. You get a planning estimate against the sprint, and a straight answer on what to cut if it runs over.

1. The core feature
2. What else version one needs
Extra user roles0
Integrations beyond Stripe1
3. Anything in this list?

Planning estimate

23 build days

day 30
  • Sprint base13d
  • AI that generates from user input7d
  • Email or SMS notifications1d
  • 1 integration beyond Stripe2d

Fits the 30 day sprint, with 7 days of buffer

Buffer is not padding. It absorbs the questions every real build raises, so the launch date holds.

Planning estimates, not a quote. The scope call turns this into a written plan with a fixed in and out list.

How it runs

Thirty days, five checkpoints, something you can click at each one.

No status reports dressed up as progress. Every checkpoint ends with a link you can open, a login you can try, or a document you sign off.

  1. 01

    Days 1 to 3

    Scope and design, signed off before code

    Together, you and I pick the one feature that proves the idea and write down everything that waits. I write a short design document: screens, data, billing, the AI piece and what it costs to run per user.

    You getA signed scope with an in and out list, plus the design document

  2. 02

    Days 4 to 12

    The first real journey, end to end

    Signup, the core feature, the result saved, the history page. One complete path through the product, deployed to a staging link you can use from day one of this phase.

    You getA staging link where you can sign up and use the core feature

  3. 03

    Days 13 to 21

    Billing, the AI piece, and the rough edges

    Stripe subscriptions in test mode, the AI feature hardened against bad input, email flows, and a basic admin view so you can see who signed up and what they did.

    You getA test mode checkout you can complete yourself

  4. 04

    Days 22 to 26

    Security, monitoring and load

    A security pass on auth and payments, dependency and secrets scanning, error alerts wired to you, product analytics, and a load test at the traffic you expect at launch.

    You getA short launch readiness report with what was checked and what was found

  5. 05

    Days 27 to 30

    Launch and handover

    Live billing switched on, production deploy, a walkthrough call, and a written guide so you or your next hire can keep building without me.

    You getA live product, the repository, and the handover guide

Scrub through the sprint

Day

12 / 30

First real journey
Design doc
Database
Signup and login
Core feature
AI feature
Stripe billing
Analytics
Alerts
Security report

AI assisted, honestly

What building with AI does and does not buy you

Every MVP shop now says AI makes them fast. The independent evidence is mixed, so here it is both ways, next to the checks that make AI drafted code safe to ship.

What the research says

19%

slower: experienced open source developers took 19% longer with early 2025 AI tools, while believing they had been about 20% faster.

METR, 2025

4 to 18%

faster in a 2026 follow up with newer tools, an estimate METR itself calls an unreliable signal.

METR, 2026

30%

of developers report little or no trust in AI generated code. Without strong testing, more AI driven change brings more instability.

DORA, Google Cloud, 2025

48%

of developers trust AI output when they can easily check it. Only 16% extend that trust to most other tasks.

Stack Overflow Developer Survey, 2026

What I do about it

  • Nothing merges unread

    Claude Code drafts, I review every diff. The speed comes from drafting, never from skipping the reading.

  • Types and tests on every push

    Strict TypeScript and tests on the paths that cost money when they break: signup, billing, webhooks.

  • Scans before launch

    Dependency audit and secrets scanning. The launch readiness report lists what they found and what I fixed.

  • Staging before production

    Every change lands on a staging link first, so you click it before your users do.

  • A budget on the AI feature

    Per user limits on model usage, so one heavy user cannot quietly run up your bill.

What ships

What you walk away with on day 30

A production web app

Next.js and TypeScript, deployed to your own hosting account. Not a prototype, not a no code export.

Signup and login

Email and social login, password reset, sessions that survive a security check.

Stripe billing

Subscriptions or one time payments, a customer portal, and webhooks that do not double charge.

The core feature

The one thing your users came for, built properly, including the AI piece if there is one.

Monitoring and analytics

Error alerts that reach you before users do, and product analytics on the events that matter.

Your code, your accounts

The repository, hosting, database and Stripe all live in your own accounts. No license fees, no lock in.

The stack

A boring, proven stack, picked so your next hire can read it

I choose tools a typical engineer already knows. The AI is in how fast I build, not in exotic dependencies you will struggle to staff.

Next.js + TypeScript

The app, typed end to end

Postgres

Your data, in your own database

Stripe Billing

Subscriptions, invoices, customer portal

Auth

Auth.js, Clerk or Cognito, picked per project

Claude and OpenAI APIs

The AI feature, with per user cost tracked

Vercel or AWS

Hosting in your account

Sentry + PostHog

Error alerts and product analytics

Claude Code

How I draft code fast; I review every diff

Your options

Four ways to get an MVP built, compared honestly

Each option trades speed, cost and control differently. Here is how they actually compare for a first version.

Who builds it

Working with me
Me, start to finish. The person you talk to writes and reviews the code.
Agency
A team behind an account manager; seniority varies by project.
Freelancer
One person, quality depends entirely on who you find.
In house hire
Your hire, once you find and onboard one.

Time to first users

Working with me
30 day sprint for a scope that fits.
Agency
Software projects reviewed on Clutch usually run about 13 months.
Freelancer
Varies; scope tends to drift without a written contract.
In house hire
Recruiting comes before any code ships.

Who owns the code

Working with me
You, from the first commit, in your GitHub.
Agency
Usually you, after final payment; check the contract.
Freelancer
Depends on the agreement and where the repo lives.
In house hire
You.

AI written code

Working with me
Every diff reviewed by me, plus tests, type checks and scans in CI.
Agency
Widely claimed; review practice is rarely shown.
Freelancer
Rarely formalised.
In house hire
Depends on your team’s practices.

After launch

Working with me
A handover guide so anyone can continue, or I keep building if you want.
Agency
A retainer or a new statement of work.
Freelancer
A single point of failure if they move on.
In house hire
Continuous, at a full salary whether or not there is work.

Shipped, not demoed

Products and systems I have shipped

I was skeptical honestly. We had two other AI consultants before him and both delivered slide decks. Jahanzaib shipped a RAG chatbot wired to our docs. Support tickets dropped 45% in month one and 60% by month three.
CTO, SaaS Platform
What stood out was that everything worked in production. Not just a demo. Monitoring, error handling, fallbacks. He thinks about the stuff that breaks at 2am on a Saturday.
Director of Engineering

Straight answer

Is a 30 day sprint right for your idea?

A good fit when

  • You can describe the one feature that proves the idea in two sentences.
  • You want real users and real payments, not a clickable prototype.
  • You want to own the code and be able to hand it to your own team later.
  • You can give me a decision within a day when a question comes up.

Not the right fit when

  • You need a native iOS and Android app in the first version.
  • The product only works with three or more user roles on day one.
  • Regulated data (health records, card data held by you) is core to version one.
  • You are still deciding what the product is. Start with the AI Audit instead.

Questions

What people ask before a build starts

Yes, when the scope fits: one core feature, signup, billing and the basics around them. That is why the first three days are a written scope with an in and out list. If your idea needs more than 30 days, the scope call says so before you commit, and the scope checker on this page gives you a first read.

Related

Tell me the idea. I will tell you if it fits 30 days.

A short call, a straight answer on scope, and a real number. If it does not fit, you leave knowing what to cut or where to start instead.

Book Meeting